Stages of a wind power generation project:
Selection and evaluation of high-potential sites;
Installation of measurement and certification towers;
Legalization and leasing of areas;
Electrical studies for connection to the basic grid;
Simulation of wind farms – Wind engineering (micrositing);
Environmental studies (RAS/EIA) – licensing;
Complementary studies and basic civil and electrical projects;
Executive engineering and economic-financial evaluation;
Registration in energy auctions and free market;
Registration of the venture with ANEEL;
Due diligence (DD).
Evaluation and approval of executive projects.
Construction supervision.
Contract administration for the client.
Third-party supply management.
Factory inspection and supervision (FAT).
Study for definition of routes and paths.
Technical-economic studies for criteria and design.
Definition of parameters.
Descriptive memorials for environmental licensing.
Planning of geotechnical investigation and soil study.
Generation and energy production studies.
Wind resource analysis.
Feasibility studies.
Environmental licensing management.
Electrical infrastructure solutions.
Civil infrastructure solutions.
Development/supervision management.
Basic and executive design.
Installation and commissioning of solar towers and anemometric towers.
Monitoring and management of the measurement campaign.
BASIC PROJECT
EXECUTIVE PROJECT
Harmonic studies.
Electromagnetic transient studies.
Mechanical transient studies.
Power flow and short-circuit studies.
Steady-state stability studies.
Request for access and connection alternatives.
Study of currents in disconnectors with grounding blades.
Compensation study.
Fault analysis.
Power quality.
Registration with the ONS/Distributor system.
Preparation and submission of necessary projects and studies.
Monitoring of deadlines for submission and receipt of documentation.
Process management until the final opinion.